port industrial automation GmbH
PORT´s CC-Link IE TSN Stack products can be obtained in different versions. Whether master or remote station (software stack) - large quantities or small quantities - PORT offers the right solution for every user of CC-Link IE TSN technology.
Developable Stations / Certification Classes
Development Method
The application decides what you need - PORT offers the right CC-Link IE TSN Master solution
for your need - Semiconductor independently.
- SDK uses GOAL, port’s Industry 4.0 platform.
- Platform is easily portable to customer’s hardware and operating system.
- Master Station sample platform is the NXP LS1028ARDB.
- Port’s Design Tool allows easy creation of application data objects (Link Devices or CANopen objects), Stack configurations and Device Description files.
Features and benefits of development methods
-
Allows implementation of Management Master station and Control Master station.
- • Management Master Station: Controls other slaves and manages the network (only one station per network).
- • Control Master Station: controls other slaves and masters (one or multiple CM stations per network).
- Supports time synchronization via IEEE 802.1AS and IEEE 1588v2 (both E2E and P2P delay mechanisms are supported).
-
Supports both hardware and software implementation of TDMA-scheduling (IEEE 802.1Qbv).
(Software implementation is less deterministic but allows support of standard MAC controllers) - Supports control communication (cyclic communication) with Slave stations and other Master stations.
-
Supports Transient Transmissions (acyclic communication) with other stations.
- • Reserved transient Transmission: acyclic communication within timeslot for cyclic communication.
- • Non-reserved Transient Transmission: acyclic communication within timeslot for standard Ethernet traffic.
- Supports SLMP (Seamless Message Protocol) for acyclic data transfer.
- Support of multiple cycle times.The Master can perform control communication with multiple slaves with different cycle times. All cycle times must be a multiple of the smallest cycle time.
- Cyclic Start/Stop: stop and restart cyclic transmission with other stations.
- Certification Class B is possible.
Developable Stations / Certification Classes
Development Method
The application decides what you need - PORT offers the right CC-Link IE TSN Remote solution
for your need - Semiconductor independently.
- SDK uses GOAL, port’s Industry 4.0 platform.
- Platform is easily portable to customer’s hardware and operating system.
- Remote Station sample platform is the STMicroelectronics NUCLEO-F429ZI.
- Port’s Design Tool allows easy creation of Application data objects (Link Devices or CANopen objects), Stack configurations and Device Description files.
Features and benefits of development methods
- Allows implementation of Remote Slave Station.
- Supports time synchronization via IEEE 802.1AS and IEEE 1588v2 (both E2E and P2P delay mechanisms are supported).
-
Supports both hardware and software implementation of TDMA-scheduling (IEEE 802.1Qbv).
(software implementation is less deterministic but allows support of standard MAC controllers) - Supports control communication (cyclic communication) with Master stations.
-
Supports Transient Transmissions (acyclic communication) with other stations.
- • Reserved transient Transmission: acyclic communication within timeslot for cyclic communication.
- • Non-reserved Transient Transmission: acyclic communication within timeslot for standard Ethernet traffic.
-
Supports SLMP (Seamless Message Protocol) for acyclic data transfer.
*Please refer to the diagram on the left.
Contact Information
Regensburger Strasse 7b / 06132 Halle-Saale
TEL/FAX +49-345-77755-0 (-20)
URL : https://www.port.de/
E-mail : service@port.de
- CC-Link Partner Association (CLPA)
Members Site